After the operation, all the concrete in the hopper and the pipeline must be output, and then the pump, hopper and pipeline are flushed, and the residual concrete output can be used for concrete construction such as tunnel bottoming and side wall。 The economical pipe cleaning method is to wash with water (clean air is used when the sewage cannot be treated, this article will not be introduced), and the pipe can be cleaned more than 260m each time。